What we build

Kitchens, bathrooms, basements, additions and whole-home remodels. Every one starts with a free walkthrough and a written, fixed-price estimate.

01

Kitchens

A new layout, or a fresh look for the one you have: cabinets, counters, tile and lighting, plus the plumbing and wiring behind them.

Usually includes

  • Layout and cabinet design
  • Counters, backsplash and flooring
  • Lighting, outlets and appliance circuits
  • Moving or adding plumbing
  • A temporary kitchen while yours is out

Typical time6–10 weeks on site

02

Bathrooms

Walk-in showers, soaking tubs, new vanities and tile, all on a properly waterproofed base, so it stays dry behind the walls for decades.

Usually includes

  • Showers, tubs and tub-to-shower swaps
  • Waterproofing under every wet area
  • Tile, vanities, mirrors and storage
  • Quiet exhaust fans, vented outside
  • Grab bars and curbless showers for aging in place

Typical time3–5 weeks on site

03

Basements

Turn the space under your feet into a family room, guest suite or home office that feels like the rest of the house, not like a basement.

Usually includes

  • A moisture check, and fixes, before anything is framed
  • Insulated, framed and drywalled walls
  • Egress windows for bedrooms
  • Bathrooms and wet bars
  • Lighting, heating and cooling

Typical time6–10 weeks on site

04

Additions

More room without moving: a bigger kitchen, a primary suite or a family room, tied into your house so it looks like it was always there.

Usually includes

  • Drawings, with an engineer where needed
  • Permits and city inspections
  • Foundation, framing and roofing
  • Siding, trim and windows matched to the house
  • Opening up and tying into the rooms you have

Typical time3–5 months on site, after design and permits

05

Whole-home remodels

For when it’s more than one room: open up a closed-off layout, bring an older house up to date, or redo it top to bottom in one well-planned project.

Usually includes

  • Opening up walls, with beams sized by an engineer
  • Updating old wiring, plumbing and insulation
  • Kitchen, baths and floors on one schedule
  • Testing old paint for lead before we disturb it
  • Work in phases if you’re living at home

Typical time4–8 months on site

On every project

The parts you don’t see, done right

Whatever we’re building, these come with it, and they’re in your estimate from the start.

  • Permits & inspections

    If your project needs a permit, it’s in the plan and the schedule, and we’re there for every inspection.

  • Protection & cleanup

    Floor protection, dust walls and a swept site every day, then a top-to-bottom clean before the final walkthrough.

  • Trades, coordinated

    Electricians, plumbers and HVAC techs, scheduled and supervised by your project lead, so you never have to chase anyone.

  • Debris hauled away

    Dumpsters, haul-away and recycling are included, and nothing gets left in your yard.

Not sure where your project fits?

Tell us about it anyway. If it isn’t work we do well, we’ll say so on the first call.

Ask us